  The process by which bricks are manufactured for the building industry can be outlined in seven consecutive steps. First the raw material, clay, which was just below the surface of soil in certain clay-rich areas has to be dug up by a digger.

  Then the lumps of clay are placed on a metal grid in order to break up the big chunks of clay into much smaller areas, which fall through the metal grid onto a roller, whose motion further segregates the bits of clay. Sand and water are added to make a homogenous mixture, which is then either formed in moulds or cut into brick-shaped pieces by means of a wire cutter.
  Those fresh bricks are then kept in a drying oven for at least 24 and a maximum of 48 hours, several dozens if not hundreds of bricks at a time. The dried bricks are then transferred to a so-called kiln, another type of high temperature oven. First they are kept at a moderate temperature of 200℃-1300℃. This process is followed by cooling down the finished bricks for 48 to 72 hours in a cooling chamber.
  Once the bricks have cooled down and have become hard, they get packaged and delivered to their final destination, be it a building site or storage.
 
以上就是新航道雅思频道为大家整理的雅思写作范文之砖块的制作,希望对大家有帮助,更多资讯、资料请访问新航道雅思写作频道 https://www.xhd.cn/ielts/xiezuo/
 
分享到:
新航道,英语成功之道。时间获取新航道英语学习资料和新鲜资讯,请在微信公众账号中搜索「新航道英语」或者「xhdenglish」,或用手机扫描左方二维码,即可获得新航道每日精华内容推送和英语学习经验分享,并参与新航道举办的各项活动。
责编:李术

图文资讯:

  • 2017年3月25日雅思考试城市有哪些?
    2017年3月25日雅思考试城市有哪些?
  • 2017年3月18日雅思考试城市有哪些?
    2017年3月18日雅思考试城市有哪些?
  • 2017年3月16日雅思考试城市有哪些?
    2017年3月16日雅思考试城市有哪些?